Knowledge base · Costs and kits

How long does it take to build a media wall?

By the Media Wall Setup Guide teamChecked

It depends on the route. A flat-pack kit can go together in hours. A stud-and-plaster wall built by a carpenter typically takes several days, plus drying time.

RouteTime quotedSource
Flat-pack MDF kit with a fire (GR8 Fires 60 inch)Typically 1.5–2 hours to assembleGR8 Fires
Made-to-order modular wall (The Wall Shop)Built in 6–8 weeks, fitted in 2–4 hoursThe Wall Shop
Carpenter-built media wall3–7 daysMyBuilder
Skimming a room1–3 daysCheckatrade

Screwfix's media wall guide says plaster can dry in as little as three days in summer, but it takes longer in cold, damp weather. Some fire manuals also set a drying time before you run the heater. Plan for the electrician's first fix before boarding and second fix after decorating.

A DIY build usually takes longer than a carpenter's, so plan a few weekends. Kit lead times also vary: see media wall kits UK.

Source: GR8 Fires, The Wall Shop, MyBuilder, Checkatrade and Screwfix, opened 15 November 2026.

Sources

Opened and checked on 15 November 2026.